If a technician can repair 15 fenders in 1 hour, how many fenders will he repair in 27.5 hours?
What will be an ideal response?
412.5 fenders
Trades & Technology
You might also like to view...
Catfish are harvested when they weigh ____ pounds
a. 3 to 5 c. 4 to 6 b. 1 to 2 d. 5 to 7
Trades & Technology
Excessive positive camber will cause tire wear ________
A) On the outside shoulder of the tire B) On both tire edges C) In the middle of the tire D) On the inside shoulder of the tire
Trades & Technology
In three-way calling, the person who initiated the call must remain on the line for the duration of the call
Indicate whether the statement is true or false
Trades & Technology
Water that condenses on an evaporator coil and is blown off by the velocity of the air through the coil is called condensate:
A) Blowoff. B) Blowdown. C) Make-up water. D) Bleedoff.
Trades & Technology