How are quality control responsibilities allocated and what are their primary objectives?

What will be an ideal response?


Quality control responsibilities often are allocated to superintendents, assistant superintendents, engineers, and field engineers in addition to their other responsibilities. Their role in quality control should be explicitly expressed and related to their assigned activities. A checklist of specific project quality concerns can be used as part of this assignment.


The primary objectives of quality control assignments are to do the following:

1. Avoid duplication of effort

2. Ensure that every quality aspect is covered

3. Provide a clear delineation of responsibilities

4. Provide effective guidance on the project to achieve quality work

5. Provide documentation of materials, installation, and tests

Trades & Technology

You might also like to view...

Which color temperature produces a balance between warmth and coolness?

a. 2,000K b. 3,000K c. 3,500K d. 4,500K

Trades & Technology

?What is the maximum width of the weld cover pass?

A. ?3/32-in (2.4 mm) B. ?1/8-in (3 mm) C. ?1/4-in (6 mm) D. ?1/16-in (1.6 mm)

Trades & Technology

A ____________________ uses several microphones connected to a set of headphones to isolate noises.

Fill in the blank(s) with the appropriate word(s).

Trades & Technology

Aftermarket service information is available in what format?

A) Internet B) CDs or DVDs C) Manuals D) All of the above

Trades & Technology