Which of the following is not considered a resource in project management?
A. deliverables
B. technical expertise
C. available staff
D. access to materials and content
Answer: A
You might also like to view...
In order for a program to run on a computer, it must be expressed in ______________________.
a) an assembly language b) a machine language c) a high-level language d) an object-oriented language e) a fourth generation language
The x -axis of the waveform view represents the ______.
A. amplitude value B. frequency C. time
Match each item with a statement below.
A. an application protocol that resolves domain and computer names to IP addresses B. a version of a Microsoft operating system that is officially released to be sold C. an early development version of software in which there are likely to be bugs, and not all of the anticipated software functionality is present D. the final stage of software testing by vendors before cutting an official release that is sold commercially E. perform a clean installation of Windows Server and migrate the server roles moving from one operating system to another operating system F. a feature of virtualization that allows a virtual machine to be moved from one server to another with little or no downtime G. a discrete OS running inside a virtual server software H. any computer used to perform real work I. an OS upgrade that overwrites your current OS J. a server computer that can be configured to run multiple virtual machines
Case 2Brandon works for a large construction firm in the Northeast. He was hired for his excellent skills in web design, specifically his experience with Dreamweaver. Brandon is eager to put his experience and skills to good use in building some promotional pages for the company. Brandon does not want the table borders to be visible. What should he do?
A. Select All Borders and then change the colore to None. B. Set the border value to 0. C. Select the table and then click the white color swatch. D. Change the cell spacing to 0 and the color to None.