What is the difference between doing a quantity takeoff and doing a full detailed estimate?
What will be an ideal response?
A quantity takeoff (QTO) is an estimate of the amount of in-place materials required for the construction of a project. A full detailed estimate is an estimate that covers everything required for the construction of the project and includes both costs and quantities for materials, labor, and equipment and subcontractor costs.
You might also like to view...
____ is a system where a pump pressurizes the oil and forces it through passageways to the specific engine parts.
a. Pressure lubrication b. Splash lubrication c. Controlled lubrication d. Axial lubrication
What is the typical life span of a hedgehog?
A) 3 years B) 5 years C) 8 years D) 12 years
A new truck tire has a tread depth of 9/16 inch. The tread depth is later measured to be 3/32 inch. What percent of the tread remains? Round to the nearest tenth of a percent
A) 56.3% B) 9.4% C) 16.7% D) None of these
Why are some reclaimed refrigerants classified as hazardous materials?
A) They have been recycled before being reclaimed. B) They are from pre-1993 systems. C) They may contain corrosive or carcinogenic chemicals. D) They have been through sealed systems.