What are some of the reasons that a contractor would be disqualified from a bid for not being a responsible bidder?

What will be an ideal response?


Some of the reasons a contractor would be disqualified from a bid for not being a responsive bidder are for not including every bid requirement that is part of the bid estimate proposal and for not submitting the bid in the format required by owners.

Trades & Technology

You might also like to view...

Express 2,070 cubic millimeters as cubic centimeters.

Fill in the blank(s) with the appropriate word(s).

Trades & Technology

120/240-volt overhead service conductors must maintain a vertical clearance of at least __________ feet above the back lawn of a house.

a. 10 b. 12 c. 15 d. 18

Trades & Technology

The adsorption of many pesticides is greater in strongly acid soils than in neutral to alkaline soils

Indicate whether the statement is true or false

Trades & Technology

A combination micrometer is designed for dual system use in metric and inch measurement

Indicate whether the statement is true or false

Trades & Technology