The _____ cost establishes the budget for the project

a. contingency
b. projected
c. estimated
d. actual


c

Trades & Technology

You might also like to view...

How does a weighted average meter measure alternating current?

A) It takes an average over a short period of time. B) It measures the current's ability to lift a small weight inside the meter. C) It reads the current at the test point and applies an averaging factor. D) It calculates the root mean square value of the current.

Trades & Technology

TCP/IP is the protocal used by all LANs

Indicate whether the statement is true or false

Trades & Technology

?A blower motor is being tested for resistance. Technician A says that a higher than specified resistance would cause slower blower operation. Technician B says debris could restrict the blower, causing motor current to go up during operation. Who is correct?

A. ?Technician A only B. ?Technician B only C. ?Both A and B D. ?Neither A nor B

Trades & Technology

What is meant by open transition starting?

What will be an ideal response?

Trades & Technology