The anchorage of the bottom track of a load-bearing CFS wall to the concrete footing

A) requires 6-in.-long additional track material to strengthen the connection.
B) requires a 6-in.-long cold-formed furring section to strengthen the connection.
C) requires 6-in.-long stud material to strengthen the connection.
D) requires no additional strengthening.


C) requires 6-in.-long stud material to strengthen the connection.

Trades & Technology

You might also like to view...

____________________ are energy sources created from organic materials that come from renewable sources such as agriculture crops

Fill in the blank(s) with correct word

Trades & Technology

The aspect ratio of a tire means ____________

A) The ratio of height to width B) Its width to diameter of a wheel ratio C) The ratio of rolling resistance D) The ratio of width to height

Trades & Technology

Electron tubes and semiconductors are identified by the reference designation and by the type number. Where is this data preferably located in reference to the symbol? ________________

Fill in the blank(s) with correct word

Trades & Technology

The four (4) major components of a vapor compression refrigeration system are the ____________________, ____________________, ____________________, and ____________________.

Fill in the blank(s) with the appropriate word(s).

Trades & Technology