Composite walls differ from veneer walls because _____

A) insulation is placed between the wythes
B) they do not have flashing and weepholes
C) both wythes are loadbearing
D) they have steel reinforcing rods embedded in them


Answer: C

Trades & Technology

You might also like to view...

When working with process equipment, which of the following factors should process technicians be aware of that can have an impact on worker safety or the environment?

A. Excess vibration B. Lack of proper PPE C. Not complying with government regulations D. All of the above

Trades & Technology

What are the five principles of floral design?

What will be an ideal response?

Trades & Technology

The tendons used for prestressing a PT concrete slab-on-ground generally consist of

A) two-strand tendons, each strand made of seven wires. B) a single 1/2-in.-diameter, seven-wire strand. C) a single 1/2-in.-diameter, nine-wire strand. D) three -strand tendons, each strand made of seven wires. E) none of the above.

Trades & Technology

To provide a direct load path through the framing system, the preferred method is _____.

a. staggered-stud framing b. in-line framing c. cantilevering d. offset framing

Trades & Technology