Technician A says that a trucks today are required to use multiple TPS to signal multiple controllers connected on the powertrain bus. Technician B says that TPS status is broadcast on the data bus to be picked up by any controller with a SA on the bus that may require the signal. Who is correct?  

A. Technician A only
B. Technician B only
C. Both A and B
D. Neither A nor B


Answer: B

Trades & Technology

You might also like to view...

Why is it not sufficient to simply make the texture of a field soil coarser when using it in a greenhouse container?

What will be an ideal response?

Trades & Technology

Most repair shops work on an "appointment basis". What is one of the reasons to use the appointment in scheduling work for the shop?

What will be an ideal response?

Trades & Technology

The ____ used with poured- in-place concrete floor systems consist of a plan view of the floor, sections, slab schedules, and notes.

A. engineering drawings B. slab drawings C. placing drawings D. floor grid drawings

Trades & Technology

Vertical pipe runs should be supported at each floor level using _____

a. clevis hangers b. riser clamps c. beam clamps d. trapeze hangers

Trades & Technology