Which is true of quality assessment in POCT sites?
A. Some instruments have internal, electronic quality control systems.
B. All quality assessment policies set up for the site by the central laboratory must be followed.
C. Quality control checks must be performed at regular intervals.
D. None of the above (a-c) are true.
E. All of the above (a-c) are true.
Answer: E
You might also like to view...
An important cardiac glycoside is:
A) digoxin B) insulin C) glucose D) heparin
Which of the following is a graduated tube used to transfer small volumes of liquids?
A. graduate B. pipet C. cylinder D. flask
Which of the characteristics of a patient's sputum should be assessed at the bedside and documented in the chart?
A. density B. DNA content C. surface tension D. viscosity
After waste products leave the renal pelvis, what is the next structure they enter?
a. major calyces c. bladder b. urethra d. ureter