A side-by-side analysis of the plumbing and electrical drawings should include which of the following elements?

a. plumbing equipment that requires electrical connections b. conflicts and interferences c. special requirements for electrical information or instructions required to be furnished by the plumbing contractor d. all of the above

Trades & Technology

NEC Article 344 provides the requirements for _____.

a. PVC b. EMT c. IMC d. RMC

Trades & Technology

Mientras se opere la grúa, la distancia minima segura desde una línea de alta tensión de más de 250,000 voltios es _____ pies.

a. 10 b. 15 c. 20 d. 25