In preparing fabrication details for a job, ____ provide the information necessary for converting centerlines of column distances into actual beam lengths and information needed for locating holes, plates, angles, etc.
A. framing plans
B. sections
C. connection details
D. engineer's sketches
Answer: C
You might also like to view...
What are the elements developed by the courts of the multi-factor test to determine whether a hired person or business is an agent or independent contractor?
What will be an ideal response?
During a storm, horses will exhibit shelter-seeking behavior by turning their ____________________ to the wind.
Fill in the blank(s) with the appropriate word(s).
Cold plates are usually filled with ____.
A. a brine solution B. a eutectic solution C. sodium chloride or calcium chloride D. all of the above
When an AC voltage is applied to an inductive load, the current is limited by ____.
a. inductive reactance b. inductive capacitance c. inductive interference d. inductive transference