Determine the distance required to transition pavement cross-slope from a normal crown section with a normal crown cross-slope of 2% to superelevation of 6% on a two-lane highway with a design speed of 50 mi/h.
What will be an ideal response?
First, determine the length of superelevation runoff required to transition from a
cross-slope of zero on the outside lane to full superelevation, using Table 15.11.
Lr = 144 ft
Next, determine the tangent runout required using Equation 15.40,
Then, the determine superelevation transition length required by summing the
superelevation runoff and tangent runout.
Required transition = 144 + 48 = 192 ft.
You might also like to view...
Many of the problems of a struggling and failing business may be associated with ____.?
A. ?poor salesĀ B. ?a mediocre product C. ?poor managementĀ D. ?unskilled personnel
Fender covers are used whenever underhood work is done.
Answer the following statement true (T) or false (F)
The two-factor theory has not always been supported by research and it is somewhat
arbitrary in its classification of factors.
Indicate whether the statement is true or false.Tomarctus, an extinct genus of canine, is believed to have lived approximately _____ years ago.
Fill in the blank(s) with the appropriate word(s).