Determine the distance required to transition pavement cross-slope from a normal crown section with a normal crown cross-slope of 2% to superelevation of 6% on a two-lane highway with a design speed of 50 mi/h.

What will be an ideal response?


First, determine the length of superelevation runoff required to transition from a

cross-slope of zero on the outside lane to full superelevation, using Table 15.11.

Lr = 144 ft

Next, determine the tangent runout required using Equation 15.40,



Then, the determine superelevation transition length required by summing the

superelevation runoff and tangent runout.

Required transition = 144 + 48 = 192 ft.

Trades & Technology

You might also like to view...

Many of the problems of a struggling and failing business may be associated with ____.?

A. ?poor salesĀ  B. ?a mediocre product C. ?poor managementĀ  D. ?unskilled personnel

Trades & Technology

Fender covers are used whenever underhood work is done.

Answer the following statement true (T) or false (F)

Trades & Technology

The two-factor theory has not always been supported by research and it is somewhat

arbitrary in its classification of factors.

Indicate whether the statement is true or false.

Trades & Technology

Tomarctus, an extinct genus of canine, is believed to have lived approximately _____ years ago.

Fill in the blank(s) with the appropriate word(s).

Trades & Technology