Explain why an easement might be required prior to installing a wind turbine generating system.

What will be an ideal response?


Before installing a wind turbine generating system, you should check to be sure no structure can be built and no trees planted on adjacent property that will block or deflect the wind from your system. If this is a possibility, you might seek an easement from the property owner specifying that no such structures will be build. Such an agreement is binding regardless of changing land ownership.

Trades & Technology

You might also like to view...

Democratic leadership is called open, free-reign, or nondirective leadership.

Which of the following electrical systems is not likely to require a ground detector?

A. 480Y/277-volt, 3-phase, 3-wire, wye-connected B. 480Y/277-volt, 3-phase, 4-wire, wye-connected C. 600Y/346-volt, 3-phase, 3-wire, wye-connected D. 480-volt, 3-phase, 3-wire, delta-connected

Trades & Technology

If you have an exceptionally long bar, rather than extend the scale to accommodate it and risk reducing the other bars to a minimal size, you should use a ____.

A. break line B. marker C. tick mark D. legend

Trades & Technology

Which weld is the first weld to be made as required by the welding symbol shown in Figure 4?

a. Fillet
b. Bevel groove

Trades & Technology