Standard takeoff sheets are used to _____
a. provide a permanent record, reduce the workload, and supplement the as-built drawings
b. reduce the workload, decrease the potential for error, and supplement the as-built drawings
c. decrease the potential for error, reduce the workload, and provide a permanent record
d. supplement the as-built drawings, decrease the potential for error, and provide a permanent record
c
You might also like to view...
Plumbing drawings, schedules, and details are successively arranged starting with page ____.
A. Pl-1 B. P-1 C. W-1 D. PD-1
The specification for the size of ____ is given as the outside diameter.
A. all pipes B. pipes smaller than 6 inches in diameter C. pipes smaller than 12 inches in diameter D. pipes larger than 12 inches in diameter
The test report specifies the test pressure and how long it must be maintained for hydrostatic testing. If it does
not, the test pressure must be at least _____ times the maximum design pressure of the installation. a. one and one-half b. two c. two and one-half d. three
Define professionalism.
What will be an ideal response?