Standard takeoff sheets are used to _____

a. provide a permanent record, reduce the workload, and supplement the as-built drawings
b. reduce the workload, decrease the potential for error, and supplement the as-built drawings
c. decrease the potential for error, reduce the workload, and provide a permanent record
d. supplement the as-built drawings, decrease the potential for error, and provide a permanent record


c

Trades & Technology

You might also like to view...

Plumbing drawings, schedules, and details are successively arranged starting with page ____.

A. Pl-1 B. P-1 C. W-1 D. PD-1

Trades & Technology

The specification for the size of ____ is given as the outside diameter.

A. all pipes B. pipes smaller than 6 inches in diameter C. pipes smaller than 12 inches in diameter D. pipes larger than 12 inches in diameter

Trades & Technology

The test report specifies the test pressure and how long it must be maintained for hydrostatic testing. If it does

not, the test pressure must be at least _____ times the maximum design pressure of the installation. a. one and one-half b. two c. two and one-half d. three

Trades & Technology

Define professionalism.

What will be an ideal response?

Trades & Technology