Which of the following statements is correct about sizing the supply-side bonding jumper on the line or supply side of the service equipment?
A. It is sized from Table 250.66 in accordance with the size or rating of the overcurrent
protective device in the service equipment.
B. It is sized from Table 250.122 in accordance with the size rating of the overcurrent
protective device in the service equipment.
C. It is sized from Table 250.102(C)(1) in accordance with the size of the service-entrance
conductors on the supply side of the service.
D. It is sized from Table 250.122 in accordance with the size of the service-entrance
conductors on the supply side of the service.
C. It is sized from Table 250.102(C)(1) in accordance with the size of the service-entrance
conductors on the supply side of the service.
You might also like to view...
Service dogs are trained to help
What will be an ideal response?
Why is agriculture the most important of all the sciences?
What will be an ideal response?
In theory, a mechanical seal should last until _____
a. the carbon face has worn away b. the spring wears out c. 40,000 shaft revolutions d. the seal faces separate
How many basic kitchen design layouts are there?
A) 4 B) 2 C) 3 D) 5