A major difference in the design of sanitary and storm sewers is
a. sanitary sewers are designed to flow half full
b. storm sewers may surcharge and overflow periodically
c. storm sewers are designed to flow half full
d. sanitary sewers may surcharge and overflow periodically
e. none of the above
b
You might also like to view...
Work equals force multiplied by ____.
A. current B. power C. energy D. distance
Technician A says the parking brake cable adjustment should be performed before adjusting the rear brakes. Technician B says the parking brake cable should allow for about 15 "clicks" before the parking brake holds. Which technician is correct?
A) Technician A only B) Technician B only C) Both Technicians A and B D) Neither Technician A nor B
The type of support that can be used to hang tubing from above or support it from below or even
horizontally is called a _____. a. split-ring hanger b. clevis hanger c. riser clamp d. pipe roller
What do the terms environmental heating and air conditioning refer to?
What will be an ideal response?