The surety bonds used in a typical construction contract are
A) bid bond, performance bond, and payment bond.
B) prescreening bond, award bond, and completion bond.
C) bid bond, performance bond, and completion bond.
D) bid bond, contract award bond, and completion bond.
E) none of the above.
A) bid bond, performance bond, and payment bond.
You might also like to view...
A ________ is an electromagnetic device that can be used to control fluid pressure in a hydraulic circuit.
A) Solenoid B) Vehicle speed sensor C) TCM D) Neutral start switch
Some wood fiber composites made for siding and exterior trim have warranties of up to ____ years, and they require less maintenance than solid wood.
A. 25 B. 35 C. 50 D. 70
The three basic types of A-CAC electrode types are copper-coated for direct current, copper-coated for
alternating current, and _____. a. plain b. low-alloy steel flux cored c. stainless steel flux cored d. nickel-coated
Technician A says the tie rods in a rack and pinion steering system should be parallel to the lower control arms. Technician B says a rack and pinion steering linkage has more friction points than a parallelogram steering linkage. Who is correct?
What will be an ideal response?