Describe a stone installation system with cold-formed steel stud backup wall given in the book.

What will be an ideal response?


A continuous galvanized structural steel channel section is anchored to the studs through a glass-mat-faced
gypsum sheathing. The stone slabs are supported by two split tail anchors at the top and two at the bottom. The
anchors are screw-fastened to the channel section.

Trades & Technology

You might also like to view...

During most driving conditions, a DFI engine operates in a very lean mode called ________ mode.

Fill in the blank(s) with the appropriate word(s).

Trades & Technology

Technician A says harsh shifts could be caused by a transmission that has not been properly “relearned” after TCM replacement. Technician B says a harsh shift could be caused by using the incorrect fluid type. Who is correct?

A. A only C. Both A and B B. B only D. Neither A nor B

Trades & Technology

Un dispositivo de aislamiento de sitio al que no se pueda acceder fácilmente en una edificación agrícola debe poder ser operado en forma remota por medio de un mango de accionamiento de fácil acceso que se encuentre a no más de _____ sobre el nivel en su posición más alta.

a. 3'-6" b. 4' c. 6'-7" d. 7'

Trades & Technology

In agricultural buildings that require equipotential planes, the equipotential plane must be bonded to the grounding system with a bare or insulated solid copper wire no smaller than _____.

a. No 8 AWG b. No 6 AWG c. No 4 AWG d. No 3 AWG

Trades & Technology