Briefly list the five items that should be included in a good change request.
What will be an ideal response?
A good change request will include the following:
• Type of change
• Configuration procedures
• Rollback process
• Potential impact
• Notification
You might also like to view...
Which of the following types of connectors is used with a CAT6 Ethernet cable?
A. RJ-45 B. BNC C. RJ-11 D. DB-9
Answer the following statements true (T) or false (F)
1) The three primary control structures are int, double, and char. 2) Repetition structures choose one of several alternatives based on a condition. 3) Sequential execution is the default control structure. 4) The following program fragment exchanges the values of x and y if x is less than y initially. ``` if (x < y) { y = x; x = y; } ``` 5. If the value of flag is 2, the following switch statement will cause a run-time error. ``` switch (flag) { case 0: cout << "Program execution successful"; break; case 1: cout << "Error in data format -- program exiting."; } ```
An image backup is the same as a system backup.
Answer the following statement true (T) or false (F)
By default, how is text aligned?
A. Justified B. Left-aligned C. Centered D. Right-aligned