A string line is stretched between corner stakes on all four sides of the excavation to establish the footing's _____.

a. outer face
b. bottom grade
c. top grade
d. upper face


c. top grade

Trades & Technology

You might also like to view...

Safety coordinators become aware of changes needed for permanent improvement in safety procedures by _____.

a. identifying the root of the accident b. keeping accurate electronic records c. receiving daily safety reports from workers d. analyzing the effectiveness of training

Trades & Technology

The most suitable cutting process to use on ferrous metals such as straight carbon steel is _____.

a. carbon arc cutting b. oxyfuel cutting c. powder cutting d. plasma arc cutting

Trades & Technology

Upon completion all brickwork shall be thoroughly cleaned with ____ and stiff fiber brushes and then rinsed with clean water.

A. acids B. clean water C. detergent D. alcohol

Trades & Technology

Compared to furnaces installed at lower altitudes, furnaces installed at higher altitudes:

A) Require a larger vent. B) Have a higher firing rate. C) Have a lower firing rate. D) Heat up more quickly.

Trades & Technology