The first step in all cable pulls is to _____.

a. lubricate the cable
b. measure runs and establish communications between both ends of the pull
c. prepare the cable ends
d. install fish tape


b. measure runs and establish communications between both ends of the pull

Trades & Technology

You might also like to view...

?Which product is made from BMC?

A. ?circuit boards B. ?heater housingsĀ  C. ?mattress foam D. ?furniture

Trades & Technology

Transmission diagnosis is being discussed. Technician A says that a scan tool can be used in place of a voltmeter. Technician B says that a scan tool is used to communicate with the vehicle's ECM. Which technician is correct?

A) Technician A only B) Technician B only C) Both technicians D) Neither technician

Trades & Technology

A mechanical contractor's normal sequence in which drawings are produced in house for a construction project is _____.

a. coordination drawings, cut lists, shop drawings b. shop drawings, mechanical plans, cut lists c. cut lists, shop drawings, mechanical plan d. shop drawings, coordination drawings, cut lists

Trades & Technology

This type of weld is applied to a butt joint between two pieces of metal.

What will be an ideal response?

Trades & Technology