The common symbol for drainage pipes is a
A. continuous line
B. dashed line
C. long dash, short dash line
D. slashed line
Answer: A
You might also like to view...
AIA Document A201 requires that the claim be made within ____ after recognizing the change.
A. 5 days B. 7 days C. 14 days D. 21 days
Answer the following statement(s) true (T) or false (F)
1. The fundamental dimensioning rules are a set of general rules that apply to dimensioning and interpreting engineering drawings. 2. Where processing information is shown on a drawing, it should be labeled mandatory. 3. Unless otherwise specified, all tolerances apply in a free-state condition, except for non-rigid parts defined with a restraint note. 4. Unless otherwise specified, where a coordinate system is shown on a drawing, it shall be right-handed. 5. Where Rule #1 applies to an internal regular feature of size, the minimum boundary (or envelope) of the regular feature of size is equal to its largest size limit (MMC).
Which of the following is used to step voltage down to lower levels before it reaches a home or office?
a. Transformer b. Generator c. Conductor d. Insulator
A prime circle ____.
A. has a diameter equal to the diameter of the base circle added to the radius of the cam follower B. is only used in the construction of an inline follower plate cam profile C. passes through the center of the follower at the 0° position D. both a and c E. none of the above