While the PM coordinator is surveying the machine, it is a good idea for him or her to ____.

A. rope off the machine
B. talk to the operator(s)
C. inspect only the crucial parts of the machine
D. inform the plant engineer


Answer: B

Trades & Technology

You might also like to view...

Describe the three forms of environmental impact analysis documentation.

What will be an ideal response?

Trades & Technology

Piston ring gap should only be measured after ________

A) Installing the rings on the piston B) Installing the piston in the cylinder C) All cylinder work has been performed D) Both A and C

Trades & Technology

The architectural scale is used to __________ the size of a drawing.

Fill in the blank(s) with the appropriate word(s).

Trades & Technology

When using graphical alignment, the ________ are recorded vertically and the ________ are recorded horizontally

A) STAT readings; MTBM measurements B) indicator readings; distance measurements C) distance measurements; indicator readings D) MTBM measurements; STAT readings

Trades & Technology