In energy-saving construction, a piece which normally provides a nailing surface for the interior ____ is replaced by metal clips.
A. plate
B. subfloor
C. drywall
D. rafter
Answer: C
You might also like to view...
Safe methods of heating a refrigerant cylinder during charging include (you may select more than one):
A) Warm condenser discharge air B) Boiling water C) An air acetylene torch adjusted to a low flame D) Warm water E) An oxy-acetylene torch with a rosebud tip F) An electric cylinder heater
Which of the following is NOT a sequential function chart sequence?
A) Multiple B) Single C) Loop D) Selection E) Simultaneous
Hopscotching is an electrical troubleshooting technique that works by:
A) Moving one meter lead from a point where voltage does not exists at a non- functioning load point by point to where voltage is found. B) Moving both meter leads randomly recording points where voltage exists and does not exist. C) Starting at a point where voltage exists and moving one lead at a time from point to point toward the non-functioning load until voltage is lost. D) None of the above.
How many paving bricks are needed to cover a concrete patio having a length of 24' and a width of 16'?
What will be an ideal response?