Technician A says that when it is necessary to rebuild a torque converter stator assembly, it should be removed first. Technician B says that cracked stator vanes can be TIG welded. Who is correct?

A. Technician A
B. Technician B
C. Both Technician A and B
D. Neither Technician A nor B


Answer: A

Trades & Technology

You might also like to view...

The main shaft is also called the ________.

A) Counter shaft B) Intermediate shaft C) Clutch shaft D) Either A or B

Trades & Technology

? Identify and state the historical significance ofSamuel Slater.

What will be an ideal response?

Trades & Technology

The three types of gas space heaters are:

A) Category I, category II, and category III. B) Natural gas, propane, and kerosene. C) Vented, unvented, and catalytic. D) Low pressure, medium pressure, and high pressure.

Trades & Technology

An entry-level engineer is given the job of creating a detailed assembly drawing of a trailer-mounted pump and motor assembly. The engineer models major components such as the diesel motor, the pump, and trailer frame as well as all the small parts such as wheels, tires, nuts, bolts, and lights. When the job is complete (after 10 solid weeks of work) and all the drawing elements are correct, the

work is presented to the supervisor. What reaction would be expected from engineering management? Was this an efficient use of resources? Do you have suggestions that would streamline the process? What will be an ideal response?

Trades & Technology