Buildings with columns of reinforced concrete or structural steel as a main element of the building frame are laid out on a ____.
A. structural index
B. keynote symbol
C. structural grid
D. polar diagram
Answer: C
You might also like to view...
An important first step when planning and preparing for a cable pull is to _____.
a. lubricate the cable b. measure the length of the run c. remove the cables from the shipping reels d. install fish tape
One goal of Mexico in its 1846-1848 war with the United States was to
A. demonstrate the strength of Latino culture. B. regain sovereignty over Texas and humiliate the hated yanquis. C. capture slaves and take them back to Mexico. D. force America to make good on unpaid claims of damages to Mexican citizens. E. liberate Indians living in the Indian Territory where members of the Five Civilized Tribes had been forced to relocate by the U.S. government.
In the ____ position, the pipe is fixed in a 45 degree inclined angle, and the weld is made around the pipe.
A. Inclined with a restriction ring 6GR B. Horizontal fixed 5G C. Vertical 2G D. Inclined 6G
Allowable stresses are specified according to ____ of lumber and grade within each of the categories.
A. purpose B. usage C. divisions D. species