Whereas lump-sum bids involve calculating a single final price and assembling a list of subtrades, with a unit-price bid, the contractor is also required to complete a "_______", that is, an itemized breakdown of the work of the project.

A. Bid Drawing
B. Estimate File
C. Pre-bid
D. Schedule of Prices


Answer: D