Which of the following statements is correct about sizing the bonding jumper to water piping in the building supplied by a feeder from the service equipment?
A. It is sized from Table 250.66 in accordance with the rating of the overcurrent protective
device for the feeder.
B. It is sized from Table 250.122 in accordance with the rating of the overcurrent
protective device for the feeder.
C. It is sized from Table 250.102(C)(1) in accordance with the size of the feeder
conductors to the building.
D. It is sized from Table 250.122 in accordance with the size of the feeder conductors to
the building.
C. It is sized from Table 250.102(C)(1) in accordance with the size of the feeder
conductors to the building.
You might also like to view...
Once the project team for information security development has created a ranked vulnerability worksheet, it must choose one of five approaches for controlling the risks that result from the vulnerabilities. List the five approaches.
What will be an ideal response?
The uppermost layer of soil is called the:
a. A horizon c. E horizon b. O horizon d. B horizon
A module is also known as a ________
A) Node B) Terminator C) BUS D) Resistor pack
In a peer-to-peer network, a discrete input such as an outdoor air sensor _____
a. must be attached to the central computer for sharing b. needs to be attached to only one controller and shared c. must be attached to each device that requires the information d. cannot be used; all inputs must be of the analog type