Under what conditions would the borrowing of new material from a borrow pit for a highway embankment be preferred over using material excavated from an adjacent section of the road?

What will be an ideal response?


The conditions under which the borrowing of new material from a borrow pit is
preferable to using excavated material from an adjacent section of highway might
include the following:
? The engineering properties of the material from the adjacent section are
not satisfactory.
? Excavation of this material may result in serious negative environmental
impacts.
? Excavation of this material might result in serious drainage problems for
the highway.
? Excavation of the material might be cost prohibitive.

Trades & Technology

You might also like to view...

Which of the following is true of a WPS?

A. It need not list every parameter. B. Critical parameters should be more closely defined or limited. C. It is not normally written in compliance with a specific code. D. It provides a general guideline, but does not list detailed information.

Trades & Technology

The SAE standard for hoist location is ________

A) JRP-2184 B) J-1980 C) SAE-2009 D) J-14302

Trades & Technology

A(n) ____ is a trim board placed at the end of the rafter or truss tails that are parallel to the building wall.

A. rafter B. cornice C. fascia D. eave

Trades & Technology

The work of Michael Graves and Jonathan Ive represent important classical design that is influencing contemporary architecture and product design.

Answer the following statement true (T) or false (F)

Trades & Technology