A duty cycle is the percentage of a 10-minute period during which a welding machine can continuously _____

a. maintain a constant voltage as the output current varies
b. produce a constant current over a wide voltage range
c. produce its rated amperage without overheating
d. establish an arc between the end of the wire electrode and the workpiece


c

Trades & Technology

You might also like to view...

Even though smaller companies may not have a formal quality control program in place, a supervisor is still mainly responsible for _____.

a. researching standards b. building a quality job c. proving controls exist d. posting safety signs

Trades & Technology

What are the four principal modes for moving freight? Which of these modes carries the largest share of ton-miles? Which carries the lowest?

What will be an ideal response?

Trades & Technology

A mowing job takes 45 minutes and must be done once a week for 22 weeks per year at $10.00 per hour. What is the labor cost per year?

a. $220.00 c. $9,900.00 b. $990.00 d. $165.00

Trades & Technology

Grasslands usually are populated:

A. only by members of the Poaceae family. B. only by dicotyledonous plants with blade-like leaves. C. predominately by blade-like dicotyledonous plants and a few Poaceae. D. predominately by Poaceae with other families mixed in.

Trades & Technology