Flaring is usually reserved for use in most ____________________ applications rather than in piping systems.

Fill in the blank(s) with the appropriate word(s).


tubing

Trades & Technology

You might also like to view...

?Using the ______  method,the construction manager may act purely as an advisor, providing guidance and expertise throughout the design and construction of a project, and does not guarantee a budget or schedule.

A. Construction Management for Fee B. Design-Build C. Construction Management at Risk D. Integrated Design Process

Trades & Technology

For ceiling joists the live load is only ____ psf.

A. 3 B. 5 C. 10 D. 13

Trades & Technology

Proper ________ is determined by the germination temperature of the seed, available soil moisture, and the need to meet production schedules.

Fill in the blank(s) with the appropriate word(s).

Trades & Technology

A developer wants to provide access to a new building from a driveway placed 1000 ft upstream of a busy intersection. He is concerned that queues developing during the red phase of the signal at the intersection will block access. If the speed on the approach averages 35 mi/hr, the density is 50 veh/mi, and the red phase is 20 sec, determine if the driveway will be affected. Assume that the traffic flow has a jam density of 110 veh/mi and can be described by the Greenshields model.

What will be an ideal response?

Trades & Technology