When is the outdoor metering device bypassed?
A) The cooling cycle B) The heating cycle
C) Both the cooling and defrost cycles D) Both the heating and defrost cycles
C
You might also like to view...
For a straight pull, the minimum length for a pull box with two 1" conduits and one 4" conduit on one wall and two 1" conduits and one 4" conduit entering the opposite wall is _____. (The conductor size is No. 4 AWG or larger, but operating at less than 1,000V.)
a. 24" b. 26" c. 32" d. 34"
Systems analysis
What will be an ideal response?
In the hole basis fit system, the basic size is the ____________________ size of the hole.
Fill in the blank(s) with the appropriate word(s).
Which of the following describes the role of fuel that enters the timing chamber in a CELECT Plus injector?
A. keeps the metering checkball seated B. hydraulic link between timing and metering plungers C. keeps the spill passage sealed D. loads the nozzle valve closed until the control solenoid is energized