The most time-consuming activity involved in setting up a form system is usually the placing and adjusting of ____.
A. form ties
B. form walls
C. rebar
D. form marks
Answer: A
You might also like to view...
What are basic drawings that use symbols and direction arrows to show the primary flow of a product through a process?
A. Block flow diagrams B. Process flow diagrams C. Utility flow diagrams D. Electrical diagrams
In a manual joining process, the placement or location of the weld bead within the weld joint affects the reinforcement, width, and appearance of the weld.
Answer the following statement true (T) or false (F)
Al instalar gajos, el borde ____ va hacia arriba.
a. plegado b. rebordado c. con traslapo d. con traslapo longitudinal
Which of the following are reasons for removing abandoned utilities?
a. they may be struck in future operations b. they may cause utility locate problems c. they may interfere with future construction d. all of the above