Dewatering of an excavation, as described in this text, can be done by the
A) pit method.
B) well-point method.
C) sump method.
D) A and B.
E) B and C.
E) B and C.
Trades & Technology
You might also like to view...
Which of the following components makes detailed tuning of diesel engine intake manifolds unnecessary?
A. charge air cooler B. precleaner C. positive air cleaner D. turbocharger
Trades & Technology
According to the National Electrical CodeĀ®, Communications cables can be run in the same raceway or enclosure as _________ conductors.
A. Electric light and power B. Class 1 C. Class 3 only D. Class 2 and Class 3
Trades & Technology
The chemical from nail products enter your body in all these ways EXCEPT:
What will be an ideal response?
Trades & Technology
When loading a powder-actuated tools, always insert the ______________ first.
A. load/charge B. nail/fastener
Trades & Technology