What is the amount of the subcontract agreement normally based on?

What will be an ideal response?


The amount of the subcontract agreement is normally based on a lump-sum bid by the subcontractor to the contractor. This bid usually is submitted in a competitive environment, with the contractor receiving several subcontract bids for each subcontract area. The contractor requires competitive bids to maintain a low, competitive bid for the owner. Most contractors will choose the low subcontract bid. Negotiation after the receipt of bids is normal to determine any missing or overlapping areas between subcontracts.

Trades & Technology

You might also like to view...

Which of the following would most likely be used to show the power distribution system of a large industrial plant?

a. schematic b. one line diagram c. cutaway drawing d. orthographic projection diagram

Trades & Technology

PROBLEM 3.12 In order to reduce the total mass of the assembly of Prob. 3.11, a new design is being considered in which the diameter of shaft BC will be smaller. Determine the smallest diameter of shaft BC for which the maximum value of the shearing stress in the assembly will not increase.

Trades & Technology

Frequency is measured in _____.

A. watts B. hertz C. amperes D. voltage

Trades & Technology

What is the five number code assigned by the Defense Logistic Service to all Department of Defense contractors called?

A. BAR Code B. CELL Code C. DLSC Code D. CAGE Code

Trades & Technology