What should an estimator do if he or she suspects that a specialty contractor’s bid is too high or too low?
What will be an ideal response?
Call and discuss his or her concerns with the specialty contractor.
Trades & Technology
You might also like to view...
The maximum recommended size of a dual-element, time-delay fuse for a 50hp, 460V, threephase motor rated at 65 FLA is _____.
a. 80A b. 100A c. 110A d. 125A
Trades & Technology
In engineering notation 0.0047 is expressed as 4.7 × 10-3
Indicate whether the statement is true or false
Trades & Technology
Orthographic projection is used to change physical objects and three-dimensional ideas into ________________________________________.
Fill in the blank(s) with the appropriate word(s).
Trades & Technology
____________________ is a condition caused by a lack of calcium, phosphorus, or vitamin D in the
diet.
Fill in the blank(s) with the appropriate word(s).
Trades & Technology