Solve the problem.Find the work done in winding up a 175-ft cable that weighs 3.00 lb/ft.

A. 45,900 ft?lb
B. 15,300 ft?lb
C. 138,000 ft?lb
D. 788 ft?lb


Answer: A

Mathematics

You might also like to view...

Solve the system of equations.  x1  - x2 + 3x3 = -82x1  + x3 = 0  x1 + 5x2  + x3 = 40

A. (0, -8, -8) B. (0, 8, 0) C. (-8, 0, 0) D. (8, 8, 0)

Mathematics

Use the properties of real numbers to simplify the expression.5s - 7t

A. -2s B. -2st C. Cannot be simplified D. -2t

Mathematics

Solve the inequality, then graph the solution.4 <  < 15

A.

?

B.  ? 

C.

D.
?

Mathematics

Translate the question into an equation. Do not solve.3.1 is what percent of 31?

A. 3.1 ? 31 = n B. 3.1 ? n = 31 C. 3.1 ? n = 31% D. 3.1 = n ? 31

Mathematics