The measurements in the table shown in Figure P12–5 were surveyed on a grid for a borrow pit. The first column in the table represents the grid location. “Existing Elevation” is the elevation before excavation, and “Finish Elevation” is the elevation after excavation. The grid spacing is 50?. Grid lines A–F run north and south. Draw the borrow pit grid to scale on an ANSI B size
sheet. Label the grid values and label the cut depths at each grid intersection. Calculate the total amount of excavated material in cubic yards and place the value on the drawing.
What will be an ideal response?
See Figure PS12–5.
You might also like to view...
What is the dimensioned thickness of part C?
What will be an ideal response?
Budding should be done during the summer months when the bark separates easily
Indicate whether the statement is true or false
Storage reservoir walls ____.
A. are designed to store water for future use B. are capable of absorbing water and drying out without damage to the structure C. cannot absorb water without risking structural damage D. can absorb a small amount of water but risk structural damage
What is the color of moisture-resistance panels that have a specially treated paper that increases the panel's resistance to moisture penetration?
A) Black B) Green C) White D) Red