Some isometric drawings can be developed with more detail if both of the construction lines are drawn at what degrees from the horiziontal.
A. 180
B. 90
C. 60
D. 30
Answer: D
You might also like to view...
A random sample will be drawn from a normal distribution, for the purpose of estimating the population meanµ. Since µ is the median as well as the mean, it seems that both the sample median m and the sample mean are reasonable estimators. This exercise is designed to determine which of these estimators has the smaller uncertainty.
a. Generate a large number (at least 1000) samples of size 5 from a N(0, 1) distribution.
b. Compute the sample medians for the 1000 samples.
c. Compute the mean m and the standard deviation of
d. Compute the sample means for the 1000 samples.
e. Compute the mean and standard deviation
f. The true value of µ is 0. Estimate the bias and uncertainty in m.
g. Estimate the bias and uncertainty . Is your bias estimate close to 0? Explain why it should be. Is your uncertainty estimate close to
? Explain why it should be.
Available hours and billable hours are the same thing
Indicate whether the statement is true or false
To insure that a gear drive cannot be reversed what should be used?
What will be an ideal response?
There are 180° in 1/4 of a circle.
Answer the following statement true (T) or false (F)