Before removing a timing belt what should the technician do?
A) Remove the water pump B) Lock the transmission in 1st gear
C) Disconnect the speedometer cable D) Align the timing marks
D
Trades & Technology
You might also like to view...
The grounded service conductor is normally referred to as the ____ conductor.
a. positive b. negative c. charged
Trades & Technology
According to the chart below, which bundle is least preferred, assuming total utility is the product of the quantity of popcorn and the quantity of sodas?
A) Bundle A
B) Bundle B
C) Bundle C
D) Bundle D
Trades & Technology
Circuit ground or chassis ground can be thought of as a:
A) neutral connection point. B) reference point. C) common point. D) all of these
Trades & Technology
In the figure below, which angles are equal to angle L?
Fill in the blank(s) with the appropriate word(s).
Trades & Technology