A/An _____ system takes a period-by-period set of master production schedule requirements (anticipated or booked customer orders) and produces a time-phased set of material, component, and subassembly requirements timed to support an expected build schedule
a. kanban
b. DRP
c. just-in-time
d. perfect order
e. MRP
a
You might also like to view...
Which of La Piana’s three levels of strategies is addressed first?
A. operational B. programmatic C. retrenchment D. organizational
Modern packaging of products can be used to fight counterfeiting/tampering and?
a. Enhance product returnability b. Enhance product manufacturing c. Enhance product traceability d. Enhance product life cycle
What degree of brand loyalty is the strongest and most desired by marketers?
A. Preference B. Requirement C. Awareness D. Insistence E. Recognition
Suppose the spot rate on the Indian rupee is Rs65.2203, the risk-free nominal rate in the U.S. is 4.6 percent, and the Indian risk-free nominal rate is 6.2 percent. Which one of the following one-year forward rates best establishes the approximate interest rate parity condition?
A) Rs64.1768 B) Rs66.2638 C) Rs62.8840 D) Rs63.0733 E) Rs67.8420