The final assembly schedule (FAS):
A) is basically the same as the MPS for a make-to-order product.
B) schedules customer orders as they are received based on components planned in the MPS.
C) is really a synonym for the master production schedule.
D) A and B above
E) None of the above is true.
B
You might also like to view...
The ____ drawing shows the member or members that will require joint preparation.
A. detail B. section C. preparation D. assembly
Describe how a technician services a power valve and what tools are used.
What will be an ideal response?
When installing an overhead service, __________ feet of conductor should stick out of the weatherhead for the formation of a drip loop.
a. 1 b. 1.5 c. 2 d. 3
_____ animals cannot digest nutrients from roughages such as grass and hay.
Fill in the blank(s) with the appropriate word(s).