What are the steps in assembling a project team? Which is most critical? Why?

What will be an ideal response?


The first step in building a project team is to examine the work breakdown structure and identify the skills required to perform the assignments. The second step is to identify the personnel that have these skills and talk to them about the project. The project manager must then negotiate with the functional supervisor about the availability of the skilled personnel. If this is successful, the team can be assembled and the project moves into the next phase of role clarification and responsibility determination. If the desired people are not available, the project manager should renegotiate with top management and if successful, then assembles the team. If negotiations with top management are unsuccessful, then the project manager should turn to a fallback position. Answers will vary as to which step is most critical.

Business

You might also like to view...

Preliminary pages are numbered with _____.

A. binary numerals B. Arabic numerals C. capital-letter alphabets D. small Roman numerals

Business

The matching of revenue with inventory costs is best achieved with the FIFO method

Indicate whether the statement is true or false

Business

On June 1, $400,000 of bonds were purchased as a long-term investment at 97.5 and $500 was paid as the brokerage commission. If the bonds bear interest at 12%, which is paid semiannually on January 1 and July 1, what is the total cost to be debited to the investment account?

A) $400,000 B) $390,500 C) $400,500 D) $390,000

Business

The length of time needed for a long-term project to recapture its initial investment amount is called the:

A) discount period. B) internal rate of return. C) present value. D) payback period.

Business