What must be done at the end of an SFC?

What will be an ideal response?


When an SFC completes its last step, you must either wire the last transition to the top of the first step or use a SFC stop element.

Trades & Technology

You might also like to view...

Technician A says the relationship of the change of pressure and altitude is inversely proportional. Technician B says atmospheric pressure decreases as altitude increases. Who is correct?

A. Technician A B. Technician B C. Both A and B D. Neither A nor B

Trades & Technology

Los-side driver transistors complete the ________ of a circuit when used to control a solenoid.

A) Mid-voltage portion B) Neutral cables C) Ground path D) Power side

Trades & Technology

The 1970 tragedy of _____________ led to the regulation of industrial wastes.

Fill in the blank(s) with the appropriate word(s).

Trades & Technology

Determine the cost to lay the CMU block in Problem 9. It takes 5.5 mason labor hours and 7.5 laborer labor hours to construct 100 square feet of wall. The average wage rate for the masons is $39.74 per labor hour and the average wage rate for laborers is $22.35 per labor hour. From Problem 9, the area of the fence is 1,667 sf or 16.67 sq.

What will be an ideal response?

Trades & Technology