The EPA requires contractors to obtain a stormwater permit for any project that will disturb the soil in an area of _____.

a. 1 acre or more
b. less than 5 acres
c. 5 acres or more
d. more than 10 acres


Answer: A

Trades & Technology

You might also like to view...

Which of the following provides high voltage across the lamp’s electrodes at startup, causing them to emit electrons?

a. Instant-start ballast b. Preheat ballast c. Rapid-start ballast d. Late-start ballast

Trades & Technology

Wireless communication in the infrared region must always be line-of-sight communications

Indicate whether the statement is true or false

Trades & Technology

The safest kind of utility knife is one with a _____

a. retractable blade b. replaceable blade c. folding blade d. self-retracting blade

Trades & Technology

Taper pins are used ____.

A. for parts that have to be taken apart frequently B. where removal of straight dowel pins can cause excess hole wear C. for applications that require perfect alignment of accurately constructed parts D. both a and b E. all of the above

Trades & Technology