An Architect would most likely use what type of estimate to create the project budget during schematic design?


Ans: Square Foot

Trades & Technology

You might also like to view...

Wood chips and sawdust are now being used as an alternative to peat moss

Indicate whether the statement is true or false

Trades & Technology

On average, each farmer in the United States produces enough food for about how many people?

a. 144 c. 184 b. 167 d. 197

Trades & Technology

A ____--an opening left in a precast member for a window, door, skylight, conduit, ductwork, piping, or for numerous other reasons--is formed by placing a wooden, styrofoam, or cardboard object the size and shape of the desired opening in the fabrication bed before pouring in the concrete.

A. silhouette B. contour C. delineation D. blockout

Trades & Technology

Which of these statements about power tool safety is not true?

a. You should use only power tools that meet OSHA standards. b. Do not operate a power tool if your hands or feet are wet. c. Most power tools do not need to be plugged into a GFCI. d. Always wear eye protection when using power tools.

Trades & Technology