Where does a subcontractor usually obtain the submittal information and shop drawings that are used to make up a submittal sheet?
a. From the construction project's architect
b. From previously archived specifications and submittals
c. From equipment and accessory manufacturers
d. From relevant schedules and site plans
c. From equipment and accessory manufacturers
You might also like to view...
The size, type and number of piles or drilled shafts is provided on the _____.
a. location sheet b. superstructure sheets c. bill of materials d. foundation layout
Wrangler Western has some of its jeans stone-washed under a contract with an independent contractor, Almos Garment Corp. If Almos’ operating cost is $22,000 per year for years 1 and 2 and then it increases by 8% per year through year 10, what is the year- zero present worth of the machine operating cost at an interest rate of 10% per year?
What will be an ideal response?
Which statements are true about wire, terminals, and connectors?
A) A wire is called a lead, and the metal end is a connector B) A connector is usually a plastic piece where the terminals lock in C) A lead and a terminal are the same thing D) Both A and C
New residential air conditioning systems now primarily use: