Before a basement floor slab is poured, drainage to the perimeter drain should be ensured by installing a layer of coarse gravel with a depth of _____.

a. 3"
b. 6"
c. 8"
d. 12"


Answer: B

Trades & Technology

You might also like to view...

All of the following contributed to the lack of development of art and artists in early colonial America EXCEPT

A. simplicity of pioneering life. B. lack of subjects to paint. C. lack of talent among the Americans. D. lack of patrons who could afford the expensive art. E. lack of art schools in America.

Trades & Technology

Which of the following supplies power to the areas that are directly related to patient care, including emergency rooms and pharmacies?

a. Emergency branch b. Essential branch c. Life safety branch d. Critical branch

Trades & Technology

The general rule-of-thumb for floral designs is that an arrangement should be at least _____ times the width of the container

A) 1 to 3 B) 1 to 3 C) 1-1/2 to 2 D) 2 to 3

Trades & Technology

The size of the job determines the number of sheets of drawings that will be required.

Answer the following statement true (T) or false (F)

Trades & Technology