List three devices used to remove the start winding from the circuit after the motor has started.

What will be an ideal response?


centrifugal switch, current relay, potential relay

Trades & Technology

You might also like to view...

In a conventional gas furnace, the hot flue gases are ____.

A. forced out a PVC vent with a blower B. recycled through a secondary heat exchanger and then vented through a draft diverter C. forced through a type B vent by a blower D. vented by natural convection

Trades & Technology

A typical cross?headed speed in a tensile machine is 0.2 in. per minute.

Trades & Technology

(PE) Water for Semiconductor Manufacturing Case It is anticipated that the needs for UPW (ultrapure water) at the new Angular Enter­prises site will continue for a long time, as much as 50 years. This is the rationale for using capitalized cost as a basis for the economic decision between desalinated seawater (S) and purified groundwater (G). These costs were determined to be CCS = $?53.58 million and CCG = $?48.91 mil­lion.

Groundwater is the clear economic choice. Yesterday, the general manager had lunch with the president of Brissa Water, who offered to sup­ply the needed UPW at a cost of $5 million per year for the indefinite future. It would mean a de­pendence upon a contractor to supply the water, but the equipment, treatment, and other costly ac­tivities to obtain UPW on site would be eliminated. The manager asks you to make a recommendation about this seemingly attractive alternative under the following conditions at the same MARR of 12% per year as used for the other analyses: (a) The annual cost of $5 million remains con­stant throughout the time it is needed. (b) The annual cost starts at $5 million for the first year only, and then increases 2% per year. (This increase is above the cost of providing UPW by either of the other two methods.)

Trades & Technology

What is an auxiliary drive system for chassis accessories such as hydraulic pumps driven by the transmission known as?

A. auxiliary transmission B. drop box C. transfer case D. power-takeoff (PTO)

Trades & Technology